Installation of a surface water drain without interrupting manufacturing production by Guided Auger Boring
From a 2.4 diameter caisson drive shaft 35 metres of DN300 VC Naylor Denlok jacking pipe surface water pipeline was installed under a 30 metre embankment to a 1.75 metre square trench sheeted reception shaft.
Both shafts were constructed prior to arriving on site, pipe installation took a total of four days.
AWL being totally self-contained and working from a small foot print enabled the manufacturing to continue without any interruption.