The scheme formed part of a new foul sewer construction replacing existing pipework which had collapsed necessitating emergency over pumping between existing manholes. All work including the construction of shafts, and installation of new pipeline connections in shafts and reinstatement was to be undertaken by a single contractor.
This project demonstrate how AWL can install different diameters of pipe with variable drive lengths without the need to use any third-party equipment.
To read project case study