For this scheme our team had to install three 30mmØ copper earth cables, each of varying length totalling 1,371m. The work area lay within an SSSI meaning no trenches could be dug, and the terrain was made even more difficult as the work was through landfill and involved tricky geology.
To overcome these challenges, we installed a special tracking walkway to ensure the SSSI was not damaged and used one of our powerful directional drilling rigs to overcome the geology.
More details of our Directional Drilling services can be found here…
Trusted Partners
For more than 30 years we have worked with some of the leading names in the Civil Engineering, Rail and Construction industries on projects across the UK. With our extensive experience in Trenchless Services and No-Dig Techniques we have built a strong and dependable name that all Construction businesses can rely on.