Mitcham - Timber Heading

Allen Watson Timber Heading crew were tasked with installing a heading for a sewer connection of 150mmØ Vitrified Clay drainage pipe for a length of 18m. A heading was the method of choice as a exit pit could not be constructed by the exisitng maniole in the road. The main challenges with this project included the discovery of asbestos when excavating the 3.5m deep shaft to perform the heading out of and the ingress of water as the water table was relatively high. Once the abestos was removed and due to the pumping within the shaft both these problems were dealt with allowing the successfuly installation of the pipe.

Contact

Telephone:
01403 790772

Case Studies

Cranleigh
The Allen Watson auger boring team were tasked with installing a 150mmØ VC pipe at Amlets Lane in Cranleigh using our 85v thrust Boring system.

Botley UTX
Installation of 660mmOD steel sleeve using GAB.155v Guided Auger boring equipment under a railway track at Botley, Southampton at a depth of 12m deep.

Mitcham - Timber Heading
Allen Watson Timber Heading crew were tasked with installing a heading for a sewer connection of 150mmØ Vitrified Clay drainage pipe for a length of 18m.

Social Media

@AllenWatsonLtd
The Allen Watson Horizontal Directional Drilling team installed a 219mmØ steel pipeline under a Railway and Taunton… https://t.co/4gCBvr02Jq

@AllenWatsonLtd
AND WE ARE LIVE! CHECK OUT THE NEW ALLEN WATSON WEBSITE INCLUDING OUR UPGRADED ANIMATIONS ON:… https://t.co/qFoudVKiwI

UVDB RISQS CQMS

We use cookies to help provide you with the best possible online experience.
By using this site, you agree that we may store and access cookies on your device. You can find out more and set your own preferences here.