Botley UTX

The Allen Watson Guided Auger Boring team were tasked with installing a 660mmOD sacrifical steel sleeve underneath a railway track in Botley, Southampton. The depth of the installation was the largest challenge as the pits were dug to a depth of around 12m meaning the GAB.155v equipment had to be lifted into the pit. Furthermore, a 12m deep pit is considered a confined space therefore the working areas needed to have the adequate equipment and procedures in place. The purpose of the steel sleeve was to accomodate a 280mmOD PE100 SDR17 rising main, of which, the annulus between the pipe and the steel sleeve was grouted. Both steel sleeve and PE pipe were successfully installed.

Contact

Allen Watson Limited

Offices at:
- Horsham, West Sussex
- Harlow, Essex
- Barnsley, South Yorkshire


Enquiries:
01403 790772

Case Studies

Cranleigh
The Allen Watson auger boring team were tasked with installing a 150mmØ VC pipe at Amlets Lane in Cranleigh using our 85v thrust Boring system.

Botley UTX
Installation of 660mmOD steel sleeve using GAB.155v Guided Auger boring equipment under a railway track at Botley, Southampton at a depth of 12m deep.

Mitcham - Timber Heading
Allen Watson Timber Heading crew were tasked with installing a heading for a sewer connection of 150mmØ Vitrified Clay drainage pipe for a length of 18m.

Social Media

@AllenWatsonLtd
We are Hiring! We are currently looking for site personnel both experienced and inexperienced. Find out more here… https://t.co/zffNBKVs4w

@AllenWatsonLtd
We are Hiring! We are currently looking for site personnel both experienced and inexperienced candidates. See more… https://t.co/77psJ5VSZb

UVDB RISQS CQMS

We use cookies to help provide you with the best possible online experience.
By using this site, you agree that we may store and access cookies on your device. You can find out more and set your own preferences here.