Alton

Our task within this project was to install 225mmØ VC pipe from a new housing development into a road in Alton using our GAB.85v system. Challenges faced within this project were the high volume of services found around the exit pit. However, thanks to the skill of the Allen Watson Auger Team the pilot hit the exit point in the desired area and allowed the successful installation of the pipe without any interference with existing services. 

 

Contact

Allen Watson Limited

Offices at:
- Horsham, West Sussex
- Harlow, Essex
- Barnsley, South Yorkshire


Enquiries:
01403 790772

Case Studies

Cranleigh
The Allen Watson auger boring team were tasked with installing a 150mmØ VC pipe at Amlets Lane in Cranleigh using our 85v thrust Boring system.

Botley UTX
Installation of 660mmOD steel sleeve using GAB.155v Guided Auger boring equipment under a railway track at Botley, Southampton at a depth of 12m deep.

Mitcham - Timber Heading
Allen Watson Timber Heading crew were tasked with installing a heading for a sewer connection of 150mmØ Vitrified Clay drainage pipe for a length of 18m.

Social Media

@AllenWatsonLtd
We are Hiring! We are currently looking for site personnel both experienced and inexperienced. Find out more here… https://t.co/zffNBKVs4w

@AllenWatsonLtd
We are Hiring! We are currently looking for site personnel both experienced and inexperienced candidates. See more… https://t.co/77psJ5VSZb

UVDB RISQS CQMS

We use cookies to help provide you with the best possible online experience.
By using this site, you agree that we may store and access cookies on your device. You can find out more and set your own preferences here.