Alton

Our task within this project was to install 225mmØ VC pipe from a new housing development into a road in Alton using our GAB.85v system. Challenges faced within this project were the high volume of services found around the exit pit. However, thanks to the skill of the Allen Watson Auger Team the pilot hit the exit point in the desired area and allowed the successful installation of the pipe without any interference with existing services. 

 

Contact

Telephone:
01403 790772

Case Studies

Cranleigh
The Allen Watson auger boring team were tasked with installing a 150mmØ VC pipe at Amlets Lane in Cranleigh using our 85v thrust Boring system.

Botley UTX
Installation of 660mmOD steel sleeve using GAB.155v Guided Auger boring equipment under a railway track at Botley, Southampton at a depth of 12m deep.

Mitcham - Timber Heading
Allen Watson Timber Heading crew were tasked with installing a heading for a sewer connection of 150mmØ Vitrified Clay drainage pipe for a length of 18m.

Social Media

@AllenWatsonLtd
The Allen Watson Horizontal Directional Drilling team installed a 219mmØ steel pipeline under a Railway and Taunton… https://t.co/4gCBvr02Jq

@AllenWatsonLtd
AND WE ARE LIVE! CHECK OUT THE NEW ALLEN WATSON WEBSITE INCLUDING OUR UPGRADED ANIMATIONS ON:… https://t.co/qFoudVKiwI

UVDB RISQS CQMS

We use cookies to help provide you with the best possible online experience.
By using this site, you agree that we may store and access cookies on your device. You can find out more and set your own preferences here.