Alton

Our task within this project was to install 225mmØ VC pipe from a new housing development into a road in Alton using our GAB.85v system. Challenges faced within this project were the high volume of services found around the exit pit. However, thanks to the skill of the Allen Watson Auger Team the pilot hit the exit point in the desired area and allowed the successful installation of the pipe without any interference with existing services. 

 

Contact

Telephone:
01403 790772

Case Studies

Ferring
We installed 150mmØ VC gravity sewer under Littlehampton Road using our GAB.85v machine from the entrance of a new housing development in Ferring. Due to our clients...

Alton
Allen Watson's guided auger boring team was tasked with installing 225mmØ VC drainage pipe from an existing housing development out to an connection in an adjacent road.

Rudgwick
The aim of this project was to install 180mmOD PE under a park from a new housing development in Church Street, Rudgwick and connect to an existing manhole within...

Social Media

@AllenWatsonLtd
AND WE ARE LIVE! CHECK OUT THE NEW ALLEN WATSON WEBSITE INCLUDING OUR UPGRADED ANIMATIONS ON:… https://t.co/qFoudVKiwI

@AllenWatsonLtd
We installed 150mmØ VC gravity sewer under Littlehampton Road using our GAB.85v machine from the entrance of a... https://t.co/Xyk4FQA2yI

UVDB RISQS CQMS

We use cookies to help provide you with the best possible online experience.
By using this site, you agree that we may store and access cookies on your device. You can find out more and set your own preferences here.